USPS VEHICLE MAINTENANCE FACILITY
United States Postal Service | Seattle, Washington
Completed: 1992 | Construction Cost: $14.8 million
Selected in a design-build competition, this project was executed from start of design to occupancy in only eighteen months. The building is a two-level 42,000-sf vehicle maintenance facility integrated with a six-level 650-space parking garage, that also provides fleet management offices and personnel support spaces. The facility features include a large paint booth, automated wash, body shop, light duty bays with overhead trolley-mounted diagnostic equipment, heavy duty bays with an overhead crane, refueling stations, battery/transmission and tire repair areas, and parts storage.